混凝土攪拌機(jī)每次使用前應(yīng)該且必要檢查的項(xiàng)目!
混凝土中科自上料攪拌機(jī)每次使用前應(yīng)該且必要檢查的事項(xiàng)如下:
The following items should and must be checked before each use of the concrete self feeding mixer:
1、檢查攪拌機(jī)身是否平穩(wěn)。
1. Check whether the mixing frame is stable.
2、攪拌機(jī)葉片及攪拌葉片支撐臂上的連接螺栓是否牢固。
2. Whether the connecting bolts on the mixer blade and the support arm of the mixing blade are firm.
3、攪拌機(jī)上料架上連接螺栓是否緊固。
3. Check whether the connecting bolts on the charging rack of the mixer are tight.
4、水泵引水是否加足,管路是否暢通。
4. Whether the water supply of water pump is sufficient and whether the pipeline is unblocked.
5、混凝土攪拌機(jī)每次使用后應(yīng)該檢查的項(xiàng)目:
5. Items to be inspected after each use of concrete mixer:
6、清理攪拌筒內(nèi)外,卸料門,料斗上的積灰,并用水沖洗干凈。
6. Clean up the dust on the inside and outside of the mixing drum, the discharge gate and hopper, and wash them with water.
7、料斗停放在運(yùn)輸位置上,并將制動(dòng)銷插好,料斗內(nèi)不得有雜物。
7. The hopper shall be placed on the transport position and the brake pin shall be inserted properly. There shall be no foreign matters in the hopper.
8、攪拌工作結(jié)束后切斷電源,鎖好電氣控制箱。
8. After mixing, cut off the power supply and lock the electrical control box.
9、酌情對(duì)攪拌機(jī)各潤滑點(diǎn)加注必要的潤滑油(脂)。
9. Add necessary lubricating oil (grease) to each lubricating point of mixer as appropriate.
10、工作結(jié)束后應(yīng)將供水系統(tǒng)內(nèi)的存水全部排盡。
10. After the completion of the work, the water stored in the water supply system should be completely drained.
以上是關(guān)于中科自上料攪拌機(jī)要檢查的項(xiàng)目介紹,相信大家都已經(jīng)了解了,想要了解更多相關(guān)內(nèi)容歡迎點(diǎn)擊咨詢ablank.cn網(wǎng)站。
The above is about Zhongke since the charging mixer to check the project introduction, I believe you have understood, want to learn more about the relevant content, welcome to click consultation ablank.cn Official website.