自上料攪拌車防抱死系統(tǒng)故障及問題
1.檢查自上料攪拌車的停車制動(dòng)器是否完全松動(dòng)。
1. Check whether the parking brake of the self loading mixer is completely loose.
2.檢查自上料攪拌車的制動(dòng)罐液位是否符合本手冊(cè)的要求。
2. Check whether the liquid level in the brake tank of the charging mixer meets the requirements of this manual.
3.檢查自上料攪拌車的所有制動(dòng)管路是否有損壞和泄漏跡象。
3. Check all brake pipelines from the charging mixer for damage and leakage.
4.檢查防抱死系統(tǒng)中的所有保險(xiǎn)絲是否完好,電線是否損壞,以及插座是否牢固。
4. Check whether all fuses in the anti lock system are intact, whether the wires are damaged and whether the sockets are firm.
5.檢查電池容量和電壓是否符合要求,以及正負(fù)極線之間的連接是否可靠。
5. Check whether the battery capacity and voltage meet the requirements and whether the connection between positive and negative wires is reliable.
6.檢查防抱死系統(tǒng)和ECI_I連接器是否牢固連接。
6. Check anti lock system and ECI_ Check whether the I connector is firmly connected.
7.檢查電路連接是否有腐蝕,損壞,松動(dòng)或接觸不良。ABS的每根接地線的接地是否可靠?
7. Check the circuit connection for corrosion, damage, looseness or poor contact. Is the grounding of each grounding wire of ABS reliable?
8.檢查輪胎是否符合要求。
8. Check whether the tire meets the requirements.
9.檢查自上料攪拌車的輪子是否轉(zhuǎn)動(dòng),輪轂的軸承間隙是否正常。
9. Check whether the wheel of the self loading mixer rotates and whether the bearing clearance of the hub is normal.
自上料攪拌車的注意事項(xiàng)
Precautions for self loading mixer
在使用自上料攪拌車之前,您應(yīng)該了解使用注意事項(xiàng)。
Before using the self loading mixer, you should first understand the precautions.
1.液壓系統(tǒng)壓力應(yīng)符合手冊(cè)中的要求,不應(yīng)隨意調(diào)整。液壓油的質(zhì)量和數(shù)量應(yīng)符合原始要求。
1. The pressure of the hydraulic system shall meet the requirements in the manual and shall not be adjusted at will. The quality and quantity of hydraulic oil shall meet the original requirements.
2.在裝載自上料攪拌車之前,應(yīng)排出殘留在攪拌筒中的殘留水和碎屑。在運(yùn)輸過程中連續(xù)旋轉(zhuǎn),以防止混凝土分離。在自上料攪拌車到達(dá)施工現(xiàn)場(chǎng)并排出之前,攪拌機(jī)應(yīng)以14-18 rpm的全速旋轉(zhuǎn)1-2分鐘,然后反向排出。停止自上料攪拌車并在倒車前不要轉(zhuǎn)動(dòng)。
2. Before loading from the loading mixer, the residual water and debris remaining in the mixing drum shall be discharged first. Continuous rotation during transportation to prevent concrete separation. Before arriving at the construction site from the loading mixer and discharging, the mixer shall rotate at full speed of 14-18 rpm for 1-2 minutes, and then discharge in the opposite direction. Stop the self loading mixer and do not rotate before reversing.
3.環(huán)境溫度高于+25攝氏度。裝載,運(yùn)輸和卸載的持續(xù)時(shí)間不得超過60分鐘,環(huán)境溫度應(yīng)低于+25攝氏度。上述時(shí)間不得超過90分鐘。
3. The ambient temperature is higher than + 25 ℃. The duration of loading, transportation and unloading shall not exceed 60 minutes, and the ambient temperature shall be lower than + 25 ℃. The above time shall not exceed 90 minutes.
4.工作時(shí),請(qǐng)勿將手伸入旋轉(zhuǎn)的攪拌桶中。嚴(yán)禁進(jìn)入主卸料槽,延長(zhǎng)卸料槽的接頭,以免發(fā)生意外。
4. When working, do not put your hand into the rotating mixing bucket. It is forbidden to enter the main discharge chute and extend the joint of the discharge chute to avoid accidents.
5.日常工作后,駕駛員應(yīng)負(fù)責(zé)將清潔水注入攪拌筒并高速旋轉(zhuǎn)(14-18轉(zhuǎn)/分鐘)5-10分鐘,然后排水以確保汽缸清潔。用高壓水清洗攪拌筒的所有部件時(shí),應(yīng)注意避免使用儀器和操縱桿。壓力水噴嘴與主體涂料表面之間的距離不應(yīng)小于40厘米。
5. After daily work, the driver shall inject clean water into the mixing drum and rotate it at high speed (14-18 RPM) for 5-10 minutes, and then drain water to ensure the cleanness of the cylinder. When cleaning all parts of the mixing drum with high-pressure water, pay attention to avoid using instruments and control rods. The distance between the pressure water nozzle and the main coating surface shall not be less than 40 cm.
我們一直在堅(jiān)持分享的路上自上料攪拌車哪家好http://ablank.cn真正為您您所需要的問題.
We always insist on sharing. Which is the best one to load the mixer http://ablank.cn Truly solve the problems you need